Monday, February 28, 2011

Siding, siding, siding


Work has been moving onward and outward since the last post. We finished fixing the drywall on the inside and installed it in the cistern room along with insulation and bug screen behind it. The windows were finished out with the gypsum returns and all the rest of the drywall was taped and mud. The window to the right of the double Anderson doors was lowered 3/4" to allow for the gypsum return on the outside soffit. We also installed the shutter door in the dormer... twice, but for a good reason so that the siding would be even on both sides.

Siding, that has been the focus lately. Whenever there is a break in the weather we are outside measuring, cutting, spacing, and nailing it up. It has been a smooth process, so far, with a good rhythm once started. The east side is about halfway finished, with the help of Mark, as well as the west side. The dormer wall was finished over the weekend so the process should pick up for the rest of the west facade. The front was finished once we installed the final custom piece that had to be primed.

Soon the tiling and hardwood floors installation will begin and will make it easier to have more people on site working, with some inside and some outside, if the weather holds up.

The Many Shades of White

The last couple of weeks Arya and I have been working on priming (surprise!) with special appearances made by the extra tall Matt C. and Laws. Using extenders, ladders, and scaffolding to stretch our 5' - 1 3/4" average height, we have slowly worked our way around the house rolling a coat of low VOC primer over every inch it. During this process we have watched the walls transform into canvases for light, with blues, oranges, and yellows dancing across them throughout the day. In the mid afternoon (around 3:30-4:00 to be exact) the swing space lights up like a lantern, glowing a yellowy orange. Late morning brings triangles of light that slowly move across the skylight wall; it's like a piece of art. But my favorite moment is in the morning: the dormer is bright and welcoming, just begging you come and read a book. It is perfect because the sun is on the opposite side of the window- so light enters, but does not shine in your eyes- and the view out frames the wooded common area behind the house.

Pictures to come soon!

Friday, February 25, 2011

Stormwater Management and Bioretention Cells

Checking the soil infiltration rate on site

Nowadays, there is a lot of talk about stormwater management. What does this actually mean? Also, how much impact can treating stormwater on site really have at the small scale of the New Norris House? In today’s blog we will take a look at these two questions.

“Bioretention cell” is the formal name for what we informally call a rain garden. Bioretention is the actual process in which stormwater is retained in a treatment area where its contaminants and sediments can be filtered out. Generally, the treatment area consists of an area of large stone or riprap where the inflow pipe or swale directs the stormwater. This area, known as a forebay, serves to slow the velocity and evenly distribute the flow of the water to help prevent erosion. The stormwater then filters into the ponding area, which is composed of a soil mix of approximately 80% sand, 20% organic material and native soil. The sand in the soil encourages rapid infiltration into the ponding area, and the organic material and clay in the native soil increases the soils water storage capacity and creates surface area that encourages the growth of microorganisms. Soil microorganisms aid in the breakdown of organic material, therefore making nutrients readily available to plants. Plant roots and organic materials in the soil help to further filter the water and hold it in place until it is able to infiltrate into the underlying soil or is evapotranspired through the plants.

In order to understand the impact that bioretention cells potentially have, we should understand what they help to prevent. When stormwater is channelized and piped into storm sewers or large-scale treatment plants, it results in an overall reduction of groundwater recharge. This leads to the long-term lowering of groundwater tables and the loss of stream flows during dry weather months. Also, when water isn’t allowed to slowly filter into the ground, it loses the chance to have the sediments and pollutants it may have picked up filtered out by soil microorganisms. Furthermore, when we plan new developments without providing areas for bioretention, the chance of “flash” flooding becomes greater.

Although the New Norris House site may seem like a small area, the benefits of treating our stormwater on site are actually quite significant. The roof area will receive over 31,000 gallons of rainwater on an average year—that is about 520 bathtubs of water that we will treat in the bioretention beds. And, hopefully, through our educational tours and community outreach, the impact of our rain gardens will become even greater.

Wednesday, February 23, 2011

Siding and Interiors Progress

Interior work continues and siding resumes as the weather in Tennessee shifts into spring. Hopefully it will stay this way!

Photo credit: Ken McCown


Time for Tile.


The Norris team has been hard at work this semester prepping for interior production. Claire and Mary have been slaving over the concept details for the interior design of the house. With the focus on light and nature, the color schemes seem to be progressing nicely within the connection to landscape. The cabinetry team is also chugging along, as they will soon be in production. The attention to detail in the house has been exquisite, so these seemingly small tasks do indeed have a major impact on the overall concept we wish to convey.

With this focus on detail, Patrick and I have taken a precision to the design of the bathroom tile. Within such a compact space, we have devoted our time to every corner and display of the tile layout. With the drawings SO close to being done, we hope to see the tile put up sometime next week. Because we are in the seminar class and not studio we may not be able to install the tile ourselves, but we look forward to our hard work being executed in the same precision we took to the drawings.

Monday, February 14, 2011

Cabinet Festivities




As a new member of the New Norris House this semester, I came into this design studio anxious to get into this design/build project. I have been on the outside looking in for the last semester worth of work, wanting to get involved. So once the semester started, I was ready to get my feet wet in building something. So with that, I started working on fabricating the exterior doors for the house with Jimmy and Matt. That lasted a brief time before I moved to team cabinet domination with Chris. After a couple of weeks of going back and forth with budget constraints we have made a couple of prototypes using the CNC mill.

We first tried to use MDF to construct the cabinets, that turned out to be not such a good idea, as our main man Steve all but insulted us. This became a prime example of architecture school meets real world. We have since decided to use a Columbia Forest Product, White Birch Plywood.


This just meant it was time to get started on the fabrication of our prototype. This was quite the task trying to learn the new CNC mill and learning Rhino. After much help from Professor Spaw, we now know how to use the mill enough to do what we need to construct these cabinets.

Here is a compilation video of the CNC mill cutting several different materials.


To give the cabinets a more streamline look, we chose Blum hardware in order to have all the hardware concealed; hinges, pulls, runners, etc. This hardware allowed us to achieve the finished product that was desired to complement the interior of "public space" within the house. Below are a few images of our finished product. With a few minor changes this will be what our final product looks like + polished white doors.

Photos coming soon...

Thursday, February 10, 2011

...a little help from our friends...

Last semester i was in the New Norris House studio, however this semester i was unable to stay with the studio team. Wanting to see the project through until my graduation, i jumped on board with the New Norris House seminar that meets less frequently and is primarily focused on the interior design and interior installation.

This semester my first task is to work with Michele (another former studio team member) on the layout and details of the tile work in the Norris House bathroom. With such a compact space, every detail around every corner must be drawn in detail to fully understand how these tiles must come together.

Today we met with Bob Brown, a tile professional, to seek advise about how to properly seal the area around the window within the shower as to avoid moisture damage. Moisture might be public enemy number one when it comes to construction, as it can wreak havoc on unseen parts of the house. Having a professional who does this everyday was very helpful to understanding how we can avoid major issues in the bathroom. He was able to give us names of products and suppliers and generally just lead us in the right direction. A special thank you goes out to him for taking time to help us out.

The meeting with Mr. Brown took place at the Norris House, which i had not seen since early January due to the limited hours of the seminar class. I was very impressed with the work the new studio team has accomplished. It was very nice to see the continuation of the work that we completed last semester look so beautiful. The drywall is impeccable, the French doors look amazing, and the house looks very nice all around. I guess the Fall 2010 team left the house in good hands. I am excited to go back in a couple weeks to see what else they have completed.