Showing posts with label tour. Show all posts
Showing posts with label tour. Show all posts

Sunday, April 15, 2012

A Tour for the Kids


One of the goals of the New Norris House is to have a positive impact on the local community. We recently hosted a second grade class from Norris Elementary. The kids were really excited to see what they are learning in school being applied in the local neighborhood. After taking two groups through the home and landscape, our tour was unfortunately postponed due to weather.


We were very impressed with how much the kids already knew about living sustainably. They had some great questions and it was a pleasure to hear them share about what they were learning in school. The teachers at Norris Elementary must be doing a great job! Hopefully we will be able to reschedule soon!

If you have a group that would like to tour the home and landscape contact us at newnorrishouse@tennessee.edu

Thursday, February 23, 2012

New Photos Added


Check out some of the new photos just uploaded onto http://thenewnorrishouse.com/photos.htm. New finished exterior, interior and site photos have been added as well as some photos of the events that have taken place on site.

As Spring is quickly approaching, we are beginning to set up more public tours of the house. If you are part of a group or organization that would like to tour the house, send us an e-mail at newnorrishouse@tennessee.edu for more information.

Friday, December 30, 2011

Happy New Year!

The year 2011 is drawing to a close, and a short reflection back on our first few months in the New Norris House reveals what we learned and what happened during that time. Similar to any new residence, there was a period of familiarizing ourselves to the house and the systems inside it. Some things in the house were brand new to us (the heating and cooling units, the rainwater cisterns, the solar hot water, and the small refrigerator and freezer), while others were familiar but required an adjustment (low flow faucets and shower, cabinet and storage configurations, and the furniture).

rainwater cistern in backyard (on flickr)
The house was ready for occupancy on July 1, and the finishing touches were completed throughout July and August. We set up our post office box and internet service, and enjoyed meeting people who came by for house tours over the 4th of July weekend. Students wrapped up their work on the yard and rainwater garden, and seeded the lawn. Kinks with fluctuating water temperature in the shower were worked out, and the solar hot water heater was installed. Railings on the deck and entry were leveled and secured. Temperature and humidity sensors were installed throughout the house. We became familiar with the air conditioning unit manual as we figured out the ideal way to run the systems in the summer heat.

the house in december (on flickr)
The official ribbon cutting ceremony for the house was in August, and hundreds of people attended and toured the house. Also that month, there were multiple media events to promote the finished project within the Norris and Knoxville areas, and at the University of Tennessee as well. Professors Tricia Stuth and Bob French, along with the student researchers and other student participants, have been a pleasure to work with during this experience. We've appreciated their patience with us while we went through learning about the house.

In the next six months, we’re looking forward to some new activities, including starting a garden in the raised beds in the backyard and exploring more of the Norris area. Until then, we wish you a Happy New Year!

Wednesday, October 26, 2011

USGBC Tour

Before talking about the latest New Norris House happenings, I should introduce myself. My name is Eric Bennett, one of the Graduate Research Assistants for the New Norris House. I am currently in my final year of the Master of Architecture program at UTK. I received my undergraduate degree in architecture from Clemson University in 2007 and I was able to get a few years of professional experience before returning to school last year. This is my first semester being involved with the New Norris House and I will be specifically working to interpret all of the energy data that is being monitored in the home. I will also help lead several tours through the home.


Last week, the New Norris House hosted a tour for the local USGBC members. It was a great learning experience for the tour attendees as well as a test for the New Norris House team to answer some specific questions from well versed local professionals. The USGBC members were led through the different phases of the project's development, from the historical precedent of the Norris community, preliminary design, off-site and on-site construction, landscape design, and through the current Phase IV, energy and water monitoring programs.

While all of the tour guests were very impressed with the overall sustainability aspects of the home's design and systems integration, the greatest compliments were aimed towards the excellent craft of construction. With all the credit going to the "newly skilled" UT students involved with the project, the New Norris House was referred to as "a beautifully conceived and executed work". So to all of the current and past students involved with the project, your hard work and dedication is being recognized, well received, and will hopefully pave the way for more design-build projects to take place within the University. I am sure that the experience gained by working on the New Norris House will have an immeasurable impact on your future career. I am excited to be involved with such a great project and I look forward to sharing what we learn.