The graph above charts the water collection potential of our cistern. The blue line represents the past 10 years average rainfall for each month. Currently, we are permitted to use the harvested rainwater for non-potable sources in the home. With two residents and high-efficiency water fixtures this leads to an average of 37.4 gallons of treated rainwater used per day. Over the next 12 months we will be analyzing the treated rainwater for contaminants. If the water is deemed safe for potable use, we may see as much as 90 gallons being used per day in the home.
Showing posts with label LEED. Show all posts
Showing posts with label LEED. Show all posts
Monday, January 9, 2012
Rainwater System and LEED Certification
Here is a link to an article published last month in PHC News. The article focuses on the rainwater harvesting system at the New Norris House. Credits have been earned in all LEED for Homes categories and we expect to earn 12 out of 15 credits in the Water Efficiency (WE) Category. 4 of these points come from WE 1.1 - Rainwater Harvesting System. Our rainwater harvesting system features technology from BRAE, a subsidiary of Watts Water Technologies.
The graph above charts the water collection potential of our cistern. The blue line represents the past 10 years average rainfall for each month. Currently, we are permitted to use the harvested rainwater for non-potable sources in the home. With two residents and high-efficiency water fixtures this leads to an average of 37.4 gallons of treated rainwater used per day. Over the next 12 months we will be analyzing the treated rainwater for contaminants. If the water is deemed safe for potable use, we may see as much as 90 gallons being used per day in the home.
The graph above charts the water collection potential of our cistern. The blue line represents the past 10 years average rainfall for each month. Currently, we are permitted to use the harvested rainwater for non-potable sources in the home. With two residents and high-efficiency water fixtures this leads to an average of 37.4 gallons of treated rainwater used per day. Over the next 12 months we will be analyzing the treated rainwater for contaminants. If the water is deemed safe for potable use, we may see as much as 90 gallons being used per day in the home.
Thursday, September 8, 2011
LEED for Homes
Over the course of the past 3 months I have been working to complete our LEED for Homes submission to the USGBC (United States Green Building Council) in hopes of achieving a Platinum certification. We are well over the Platinum threshold and are currently projecting that we will exceed it by 27 points. Once certified, we will be the 6th (maybe 7th) LEED for Homes Platinum project in the state of Tennessee. Furthermore, we will be the first LEED platinum project in the University of Tennessee's building stock.
While the documentation itself is more or less complete, we have been working on a large publication to accompany our submission. We hope that our efforts can serve as a case study for others and the book will be available for purchase/ download in the coming months! Below you will find some draft spreads of the 264 page document. Enjoy!
The cover of the book.
The fist section deals with the story and background of the New Norris House. This includes history, design objectives and strategies, and process work.
The second section is the home's user manual. It contains specific information about the operation of the home's systems (rainwater, solar hot-water, HVAC, etc), care and maintenance schedules (floor, siding, landscape, etc) as well as information about lifestyle choices (recycling, composting, purchasing greenpower, etc).
The third and final section is a detailed description of every LEED point acquired by the project. In the credit shown above, information is given about removed exotic species and efforts to re-mediate the site.
This credit details efforts made to avoid the use of tropical wood (in our case, lauan).
The above credit details efforts made to control contaminants during the construction phase.
Friday, January 21, 2011
A New Norris Landscape: Sustainability and LEED
The town of Norris has been rooted in a sense of self-sustainability since its inception, and the landscape has played a key role. The Norris landscape was originally conceived as a scenic beauty but also as a productive, research-oriented, life and work-sustaining tool. It only follows then that the focus on sustainability and LEED accreditation applied at the New Norris House would extend into its surrounding landscape as well.The site and landscape plans are important factors when considering LEED accreditation. The approach to the Sustainable Sites credits begins with the stewardship and remediation of the existing site. During construction, measures have been taken to prevent erosion, limit the disturbance of the site, and remediate existing conditions that could adversely affect the long-term environmental sustainability of the site. Strategies include the use of silt fences and erosion control blankets during construction, a clear plan delineating the proper equipment and material staging and work areas to prevent unnecessary site disturbance, undoing previous soil compaction, and removing all invasive plant species and non-sustainable plant species from the site.
The stewardship of the site continues through a landscape design strategy that responds to several aspects of creating a sustainable site. The ornamental plant materials specified have been chosen for their drought-tolerance, native status, and/or wildlife benefits. A no-mow meadow along the western edge of the site includes native perennials and grasses and will provide habitat and food for wildlife as well as soil regeneration and increased surface water retention and infiltration. A second no-mow meadow along the road right-of-way will capture sheet flow in a rain event and provide a permeable area for surface water percolation. The existing turf grass blend will be removed during the construction phase and replaced with a drought-tolerant species that does not require frequent mowing, chemical supplements, or irrigation after establishment.
Stay tuned for more information on the rainwater irrigated vegetable beds, grey water garden, and rain garden!
Monday, October 25, 2010
LEED Prefabrication
While the New Norris House is committed to achieving LEED platinum certification, we have carefully examined every opportunity to earn LEED points. This process of identifying possible points typically begins even before the design of the building. For the New Norris House, we realized that many points could be achieved through off-site prefabrication.There are many advantages to using prefabricated construction. First, it is generally less destructive to the site and requires less room for staging materials. As far as energy efficiency, there is typically better quality control, which leads to a tighter, more efficient envelope. Prefabrication also encloses the interior faster than traditional methods of building, reducing the time that materials, finishes and products are exposed to rain, sleet, and snow.
We have witnessed the advantages of using prefabricated construction first hand while working on the New Norris House. In one day, the house was brought from the factory at Clayton Homes and dropped onto the foundations with its moisture barrier in place. However, we have also seen how using this method of construction can be inconsistent with its original intent. One such shortcoming of prefabrication was seen during the installation of the home's dormer which was prefabricated by the students at the College of Architecture and Design.
For such a small component of the house, the dormer took a considerable amount of time and resources to install. Using seven people and a Sky Lift, we spent four hours installing a component of the house that had already consumed numerous man-hours in prefabrication and had been transported to the site. In reality, it would have taken about the same amount of time to build it on-site using conventional methods of construction as it did to merely install it. Another advantage of building it on-site is that we would have been able to adjust for certain construction tolerances that were overlooked while building it in a laboratory setting.
We have seen the advantages and the disadvantages of prefabricated construction while working on the New Norris House. While building small, unique components, prefab construction loses many of the efficiencies that it touts. However, its full potential can be realized at any scale when using repetitive systems.
Monday, October 11, 2010
Save the Earth
This evening I attended the City Council Meeting in Norris with a couple of my fellow team members. They were kind enough to let us give a presentation updating them on all of our continuing progress as their newest neighbors. It’s wonderful to have the communities support and interest in all of our endeavors.
At this meeting I presented a synopsis of our endeavors in achieving LEED certification. This is an important system because it consolidates all our environmentally conscious efforts to be measured against pre-established standards. Right now, we are anticipated to obtain 97 points under the LEED for Homes rating system which will give us a LEED Platinum rating, which is the highest level available (go us!). To help us achieve our goal, we are attempting to obtain close to the highest number of points possible in several categories including Sustainable Sites, Water Efficiency, and Energy and Atmosphere. The majority of these points come from our pre-established design goals including limited material waste, re-use of rainwater, and efficient landscaping. Building in the Norris community also helps us attain points for the Locations and Linkages portion of the system. We get credit for building on a previously developed lot, having easy access to already established community resources, as well as for being half a mile from a publicly accessible park. While the LEED system itself is a great way to suggest goals for those looking into environmentally friendly building, it is important to concentrate on the ideals that underlie the system rather than getting bogged down with the paperwork and requirements associated with it.
Friday, September 17, 2010
Excavation Begins

Excavation of the site began yesterday. This is such a big step not only because it signifies our on-site construction is underway but also because it commences our LEED efforts to keep the site sustainable. The orange band seen in the pictures is the silt barrier which has been installed to keep the top soil from leaving the site. As simple as it seems, this band is very important for keeping erosion to a minimum as construction progresses. We were happy to receive an email from Bruce, our LEED Green Rater from NRG, saying our efforts were looking good so far!