Tuesday, November 16, 2010

Give Thanks


So far things are coming along swiftly at the site despite weather setbacks. The East and South elevations are about 95% done with the furring and the insect screen has completely blanketed the Southern elevation. All that is left is to get the window blocking paired up with the supports for the steel canopies on both of these elevations. Passersby might be curious as to why we are placing screen on the elevations. This is because our siding is somewhat like vertical board and batten siding but without the battens. We hope the screens will prevent insects from nesting between the vertical planks of Atlantic White cedar.

It is exciting to see things showing progress as we attempt to complete the exterior in time before the end of the semester. Let's hope we can manage to find a break in weather this week so that our roofers and other site work can be completed before the week finishes out. Next week is Thanksgiving and of the many topics of discussion on the worksite include our hunger for the feasts that shall occur next week. This has been able to keep us striving along with that final goal of some accomplishment. Also this gives us an opportunity to give thanks for being able to work on such a project. I am thankful for this experience to work in a design/build project. I am also thankful for having such a great team of peers, professors, contractors, as well as other professionals that have contributed to the learning process this semester.

Wednesday, November 10, 2010

Things are beginning to take shape, and long-awaited moments are being realized.
The house officially has three installed windows! Earlier in the day, a few of the openings underwent some prep work including trimming of the exterior rigid insulation and flashing installments. By the end of the day, three windows were in place.
House Norris is also very close to being able to wear its beautiful siding for the late fall season. Some of our team members have been working very precisely on mounting the furring strips for the siding which has been in the priming process for many hours back at the architecture building.
The site has also been seeing a few new working faces. Some electrical work was done today, and the backyard portion of the site is in the process of being graded.
It is this interaction with the other non-student participants that I feel may be somewhat overlooked. The amount we learn from them is incredible, even if it's just knowing that and why they are there with us. We may not have worked with the plumbers or electricians directly, but seeing them on site for a few days reminds us that this work is also a necessary part of the building (and design) process. Those with whom we DO interact are teaching us more that we might have expected. Albert from our general contractor, Johnson and Gallion, has really surprised us with the amount of effort put into teaching us. We are grateful for his explanations and demonstrations on both the small scale (how to set up a roof angle with the speed square or putting tape on his safety glasses when not in use to protect them from being scratched) and the larger scale (how to install a door or window). Oftentimes we find ourselves in awe of these professionals' skills (like using a circular saw with just one hand!). This more practical learning, I think, is just as important and enjoyable.

Wednesday, October 6, 2010

Ready, Set, GO!



Well the last few weeks have definitely been a race to get the foundation ready for the big delivery as well as preparing the dormer for attachement. With both those accomplished last week and this week we are now moving on to bigger things.On site, the foundation and piers are now nearing completion with intentions of pouring the bond beam on the rest of the foundation tomorrow morning. This includes finishing up pouring the Perlite as the foundation insulation and getting things ready for the house drop next week!
Back at headquarters, Jimmy has been working on the window frames and tackling the monster of a frame that shall eventually flood northern light into the lofted area. Meanwhile, Katharine and myself have been putting together a temporary door for extra security until we get the final doors built. (You'll just have to wait and see what surprise is in store with this temporary door.) Arya and Michele broke in the new StopSaw working on the furring strips for the gabled ends of the house, though no one seems to want to test out the brakes on the system-I wouldn't blame them either. Plus the four of us have been continually working on priming more and more siding for the house. As Patrick noted, the feat of installing the siding is going to be just as time consuming, but the end results will be worth it.
With fall break encroaching on us tomorrow and Friday we all are assuring ourselves that our efforts will not go unnoticed while we are gone. I am sure we all will be rejuvenated and ready to kick it into high gear for the race to the end of the semester.