Showing posts with label wood. Show all posts
Showing posts with label wood. Show all posts

Friday, November 4, 2011

Fall color, inside and out

Autumn is here, and leaves are turning and falling. The riot of color outside changes a bit every day. Brown, red, rust, orange, yellow, and ochre leaves are mixed with green grasses and shrubs, and collect in piles when they fall.

from green to red to orange to yellow
Last week as I stood on the deck and looked at the trees in the back, it struck me that the colors used in the house are perfect complements to the colors in the fall landscape. Although white is the predominant paint color in the house, there are two other colors used on walls that can’t be seen from the main living area. The bedroom and bathroom each have an accent wall in golden yellow, and the swing space and loft each have an accent wall in reddish orange. Both colors match leaves hanging on to some of the trees around the house; the visual continuity of the outdoor and indoor is pleasing to the eye.

bedroom & bathroom
swing space & loft
Because the colored walls are balanced by white walls, the light coming in through the windows creates a reflection of that color on opposite walls. The photo below shows the effect—the only wall that is painted is the one down the middle, and the color faces the left. The light entering the skylight on the right has a much cooler tone since it is reflecting off a white wall. (View the original photo here.)


The furniture cushions and pillows are a light leafy green and buckskin, with one pillow in a contrasting reddish orange fabric similar to the paint color. The floor and kitchen counters are made of wood, with the floor a red oak and the counter a lighter more yellow oak. Houseplants have leaves ranging from chartreuse to dark green. Tile in the entryway is blue slate (although not visible from the house, reminiscent of the expanse of water on Norris Lake). All these interior colors have easily identifiable foils outside, and bring nature into the house this autumn.

furniture cushion
red oak floor
entryway tile

Monday, March 28, 2011

Wood Floor Arrives!



Tuesday afternoon we received a load of reclaimed white oak floors from Salvage Antique, LLC. Scott Brady of Salvage Antique has been generous enough to donate the materials as well as aid in the installation of the floor in the coming week. The wood itself (originally cut down nearly 150 years ago) is quite beautiful is comes from a former barn in Kentucky. Check out the Salvage Antique website here to learn more about their product: http://www.salvageantique.net/

To finish the floors, we will be using an environmentally friendly product made by OSMO North America. Often floor finishes can be extremely high in VOCs (Volatile Organic Compounds) and this can adversly effect the interior air quality over time. We have been fortunate enough to partner with OSMO and a specifying a floor finish that is exteremly low in VOCs. Not only will this make our building healthier to live in, but it also earns us LEED points. You can learn more about the OSMO on their website: http://www.osmona.com/

Monday, January 10, 2011

Siding in-progress...



Classes will recommence Wednesday and there is plenty of siding work left to complete. This photo is a nice example of how the final facade will look, but there is nearly 80% of the work left to do! Let's hope for warmer weather!

Wednesday, November 3, 2010

rain, rain, go away.

Unfortunately the weather seems to be getting the best of team Norris. We had another day a rain today which meant that we were unable to continue with the unfinished business on site. Fortunately there was plenty of work to get done in the computer lab and in the woodshop. We also were able to tend to some general housekeeping details that have been piling up while we have been on site.

The windows and doors are coming along slowly but surely. A large group of us spend most of today in the woodshop preparing wood for the blocking and framing portions of the windows. The glass for the windows was delivered yesterday, Tuesday the 2nd, and we all look foreword to the day we can see all the pieces come together in all their beauty. One thing we are nervous about however is getting the glass panels to the site. They are quite large and heavy and, as we all know, glass is…well…glass.

Having spent the entire day in the woodshop I have discovered that although our woodshop in the art and architecture building on campus is more than adequate for most of what the students need, it can sometimes become very cramped and crowded when you are trying to build large scale objects for an actual building rather than a small scale model. I feel that if the university plans for more design-build projects in the future, an investment in a larger workspace dedicated solely to the design-build program is necessary.

While most focused on the windows and doors, a few headed to the computer lab to work on certain details of the Norris House, and to finalize the job site sign that includes the names of all our sponsors. Allie Ross, who has experience with LEED documentation, took today to organize and read over our LEED folders. She believes that she may have found an extra point that we can acquire- great news as we need as many as possible to reach our goal of LEED Platinum.
Although we were able to get a lot done today while in the art and architecture building, we hope that the weather cooperates with us on Friday so we can get out to the site and complete a few things before the weekend. The forecast calls for afternoon showers, so keep your fingers crossed that the weather will shift in our favor.
Peace.Love.Norris….

Wednesday, October 6, 2010

Ready, Set, GO!



Well the last few weeks have definitely been a race to get the foundation ready for the big delivery as well as preparing the dormer for attachement. With both those accomplished last week and this week we are now moving on to bigger things.On site, the foundation and piers are now nearing completion with intentions of pouring the bond beam on the rest of the foundation tomorrow morning. This includes finishing up pouring the Perlite as the foundation insulation and getting things ready for the house drop next week!
Back at headquarters, Jimmy has been working on the window frames and tackling the monster of a frame that shall eventually flood northern light into the lofted area. Meanwhile, Katharine and myself have been putting together a temporary door for extra security until we get the final doors built. (You'll just have to wait and see what surprise is in store with this temporary door.) Arya and Michele broke in the new StopSaw working on the furring strips for the gabled ends of the house, though no one seems to want to test out the brakes on the system-I wouldn't blame them either. Plus the four of us have been continually working on priming more and more siding for the house. As Patrick noted, the feat of installing the siding is going to be just as time consuming, but the end results will be worth it.
With fall break encroaching on us tomorrow and Friday we all are assuring ourselves that our efforts will not go unnoticed while we are gone. I am sure we all will be rejuvenated and ready to kick it into high gear for the race to the end of the semester.