Wednesday, February 23, 2011

Time for Tile.


The Norris team has been hard at work this semester prepping for interior production. Claire and Mary have been slaving over the concept details for the interior design of the house. With the focus on light and nature, the color schemes seem to be progressing nicely within the connection to landscape. The cabinetry team is also chugging along, as they will soon be in production. The attention to detail in the house has been exquisite, so these seemingly small tasks do indeed have a major impact on the overall concept we wish to convey.

With this focus on detail, Patrick and I have taken a precision to the design of the bathroom tile. Within such a compact space, we have devoted our time to every corner and display of the tile layout. With the drawings SO close to being done, we hope to see the tile put up sometime next week. Because we are in the seminar class and not studio we may not be able to install the tile ourselves, but we look forward to our hard work being executed in the same precision we took to the drawings.

No comments:

Post a Comment